Dryset Wall Systems/Fieldstone Stack Walls
The area is excavated and the footing is dug. A 1 ft. thick base is laid using a ¾” quarry process stone. The stone is then compacted. Lines are run and elevations are checked. The blocks or stones are set and we fill behind the wall with clean gravel for drainage purposes. Once the wall is at a proper elevation, we set cap stone and back fill.